Access Division – Abseil Eyebolt Post Installation – Vermont Construction – Media City, Salford
Vermont Construction instructed NSS Testing to supply and install an abseiling system comprising of 76no steel galvanized Abseil Posts positioned around the perimeter of the roof at approximately 1500mm to 2000mm centers and 300mm from the inner face of the parapet wall. The work commenced in November 2018 and was carried out in phases due to site constraints; the installation was completed in February. See images