Overview
NSS was appointed to carry out the safe replacement of a damaged high-level glazed unit at Deansgate Towers, a prominent residential landmark in Manchester. Due to the unit’s location at height on the façade, specialist access was required to complete the work without disruption to building operations.
The Challenge
- The glass panel was located at a significant height, inaccessible via standard methods.
- The building remained fully occupied, requiring careful coordination to ensure minimal disruption and maximum safety.
- The replacement needed to maintain the building’s aesthetic and structural integrity.
Services included;
The Solution
To access the glazed unit safely, NSS utilised the building’s BMU (Building Maintenance Unit) cradle system. Our specialist glazing team, trained in BMU operations and high-rise façade work, carried out the following:
- Developed a detailed Risk Assessment and Method Statement
(RAMS) - Worked with building management to implement a safe
exclusion zone below the work area - Used the BMU cradle to safely reach and remove the
damaged unit - Installed a like-for-like replacement with precision, preserving
the tower’s exterior finish
Results
- Glazing replaced safely and successfully using the existing BMU system
- Zero disruption to residents or building operations
- No health and safety incidents Project completed on time, to specification, and with a high quality finish.